Power Generation hire Australia

Temporary power is a system of generation, distribution, fuel, protection and redundancy. A generator on its own is rarely enough.

Specify the work

Which loads must run together, and which start intermittently?

Build a useful equipment enquiry
Work requirementDescribeAsk the supplier
Steady demandEquipment ratings and run patternList simultaneous operating loads.
Starting demandMotors and start sequenceHave the supplier review transient requirements.
DistributionOutlets, cable routes and protectionArrange the electrical design and installation responsibilities.

Do not add nameplate numbers and assume they identify a suitable generator. Starting behaviour, power factors and the proposed installation need a competent assessment.

Read the detailed planning guide →

What power generation can you hire?

Power Generation Hire in Australia covers a range of machine types and sizes. These are the most commonly hired, and what each is typically used for:

MachineTypical use
Portable generators (2–20 kVA)Small tools, trades and events
Towable generators (20–500 kVA)Construction sites, compounds and shutdown work
Containerised generators (500 kVA+)Industrial standby, mining and critical loads
Lighting towersNight works, roadworks, events and security
Distribution boards & cablingGetting power safely to each load
Load banksTesting generators and standby systems under load

Before you request a quote

A useful enquiry tells the supplier what has to be achieved, where the equipment will work and what could change the selection. Include dimensions, quantities, material conditions, dates, the delivery route, unloading area and any site compliance requirements.

Compare offers on the complete configuration: machine, attachments, operator (for wet or dry hire), transport both ways, minimum hours, fuel and return conditions. See how to read a plant hire quote.

Selection factors

Three things that change the answer.

01

Running and starting load

Motor starting currents can be several times the running load. List every significant load and how it starts.

02

Redundancy for critical loads

Pumps, medical, data and refrigeration may need N+1 generation or automatic changeover.

03

Fuel and distribution

Plan refuelling intervals, bunding, cable runs, RCD protection and who is responsible for electrical compliance.

Power Generation Hire companies

19 suppliers to compare.

Filter by state →
FAQ

Power Generation hire questions.

What size generator do I need?

Add up the running loads, allow for the largest motor's starting surge and add headroom. A supplier can size it from a load list.

Are generator hire rates inclusive of fuel?

Usually not. Fuel is typically supplied by the hirer or charged on return or via scheduled refuelling.

Can generators run 24/7?

Yes, with a refuelling plan and scheduled servicing. Longer hires often include maintenance visits.

Do I need an electrician?

Connecting to installations or distribution normally requires a licensed electrician. Ask the supplier what it installs and certifies.