Understand the labels
Dry hire generally supplies the machine without an operator. Wet or operated hire normally combines plant and operator, though inclusions vary. Always confirm fuel, transport, attachments, overtime, consumables and supervision rather than relying on the label alone.
Match responsibility to capability
Dry hire can suit teams with competent operators, supervision, daily inspection systems and capacity to protect the machine. Operated hire can transfer operating expertise and may improve productivity on specialist work. It does not remove the principal contractor's site duties or the need for a clear scope.
Compare productive output
Compare likely completed work, not only hourly cost. An experienced operator who knows the machine and attachment may offset a higher rate. Conversely, a long-duration repetitive task may favour dry hire where the project already has suitable people and support.
Who is responsible for operating and supporting the machine?
Use the offer's written inclusions rather than relying on the label. Confirm the operator, fuel, supervision, travel and daily-care responsibilities.
| Decision | Information needed | Next step |
|---|---|---|
| Dry hire | Equipment without a supplied operator | Identify the site's competent operator and daily responsibilities. |
| Operated hire | Machine and operator scope | Clarify ordinary hours, travel and overtime. |
| Package comparison | Fuel, attachments and support | Request equivalent inclusions from each supplier. |
A worked planning example
A hypothetical short excavation job receives a dry-hire offer and an operated-hire offer. The dry price cannot be compared directly with the operated rate without considering the operator and other responsibilities. Ask each supplier to specify the same task, duration, attachments and transport. For the operated option, confirm travel, minimum shift and overtime. For dry hire, establish the site's operator and care arrangements. Keep the project team's assessment of competence and suitability separate from the price arithmetic.
Common mistakes to catch
- Assuming wet hire always includes fuel.
- Comparing an hourly operated rate with a daily machine-only rate.
- Leaving minimum shifts and travel out of the total.
References for your enquiry
Official pages consulted on 24 September 2026. The examples above are original planning illustrations.
- Kennards Hire: contract conditions ↗
An example supplier contract to consult when checking hire responsibilities. These terms do not apply to other suppliers by default.
- Coates: terms of hire ↗
A second supplier's published terms. Read the actual offer and applicable conditions for your booking.
General guidance only. Confirm project-specific requirements with competent people and the proposed supplier.