Handover and return evidence

A disciplined ten-minute condition record can prevent disputes and make defects visible before equipment enters production.

Inspect before accepting

Photograph all sides, hour meter, fuel level, tyres or tracks, glass, panels, attachments, pins and hoses. Record warning lights, leaks and existing damage. Match serial numbers and included items to the docket before the delivery driver leaves.

Capture the operating handover

Confirm controls, isolation, emergency systems, daily checks, fluid requirements, regeneration procedures and any machine-specific limits. Make manuals and supplier support details accessible to authorised operators throughout the hire.

Close the hire deliberately

Repeat the condition photographs, record hours and fuel, remove project material and confirm collection timing. Report damage or defects promptly rather than waiting for off-hire inspection. Keep the off-hire confirmation with the project record.

General guidance only. Confirm project-specific requirements with competent people and the proposed supplier.