Explain what is being moved
Describe the fluid, expected solids, source and how conditions may change during the job. Include the approximate quantity and required timeframe without presenting an uncertain estimate as a measured flow. Ask the supplier which additional measurements are needed to select the equipment. A pump suited to one fluid or duty may be unsuitable when the material or operating conditions change.
Show the route
Provide suction and discharge positions, vertical differences, hose distance and proposed bends or obstructions. Let the supplier assess the duty and hose package from those details. Include strainers, couplings and any supporting equipment in the quotation. Check who assembles the system and verifies it before use, particularly when hired equipment connects to a system already on site.
Settle discharge before mobilisation
Identify who has responsibility for confirming an appropriate discharge or receiving arrangement and any site approvals. Do not assume that water can be directed to a street drain or adjoining land. Treatment, storage or tankering may need to be arranged separately by the project team. State these dependencies in the programme so a delivered pump does not become a paid waiting asset.
Discuss supervision and failure
Tell the supplier if the system is expected to run unattended or outside normal hours. Ask about monitoring, maintenance, refuelling and replacement options for the proposed duty. Nominate who responds to a fault and how the site can be accessed. Keep the quoted duty with the hire record so changes in hose length, fluid or discharge point trigger a review.
Put it into a practical brief
For removing water from a work area, send a sketch with the source level, proposed pump position, discharge route and receiving arrangement. Explain whether the fluid conditions may change as the water level drops. Ask the supplier to nominate a system for that duty and identify the measurements still required. Confirm who monitors it and who can authorise changes. If the discharge point moves during the project, have the revised route assessed before extending hoses or treating the original performance expectation as unchanged.
What must be settled before the pump arrives?
Establish the liquid, required duty, hose route and discharge destination together. The receiving arrangement is part of the job, not a detail to resolve after pumping begins.
| Decision | Information needed | Next step |
|---|---|---|
| Source | Liquid, solids and water levels | Describe how conditions may change. |
| Duty | Required movement and route | Provide lift, distance and hose details. |
| Destination | Acceptance and treatment | Assign responsibility for discharge arrangements. |
A worked planning example
A hypothetical excavation collects water that must be managed before work resumes. Provide the source description, expected levels and proposed destination. Ask the supplier for the complete pump, hose and connection package. Have the project team establish whether treatment or other discharge arrangements are required. Include how the equipment will be monitored and supported outside normal hours. If the water characteristics or discharge route changes, review the arrangement before continuing; a pump capable of moving the liquid does not establish that the destination may receive it.
Common mistakes to catch
- Ordering a pump without identifying the discharge point.
- Omitting hose length and changes in level.
- Assuming unattended running requires no support plan.
References for your enquiry
Official pages consulted on 24 September 2026. The examples above are original planning illustrations.
- Safe Work Australia: managing risks of plant ↗
Model guidance for plant-related risk management. Check the applicable state or territory requirements and the specific manufacturer's instructions.