By Plant Hire Directory · Editorial approach
Expanded with a decision table and planning example · Updated
Map the dependencies
List the work packages and identify what must be ready before each can start. An excavator may need trucks, a shed may need connections and an access platform may need a clear delivery route. Put these relationships into one schedule with responsible contacts. The purpose is to identify missing handoffs before a supplier reserves equipment against an incomplete start date.
Give everyone one current brief
Use a dated version of the site plan, access instructions and programme. When something changes, identify which suppliers are affected and obtain acknowledgement from each. Avoid relying on a forwarded message whose attachments or timing are unclear. Make equipment substitutions visible to the people handling transport and adjacent work, because a replacement can change more than one contractor's scope.
Allocate the interfaces
Name who controls delivery slots, unloads equipment, arranges inductions and confirms readiness for work. Record who supplies consumables and supporting services at each handoff. Ask every supplier to state exclusions so gaps can be assigned rather than discovered on arrival. Keep the responsibilities proportionate to the job: a small shared checklist can be more usable than a long document nobody maintains.
Track changes and close together
Record extensions and off-hire separately for each booking while checking the effect on the remaining fleet. A delayed collection or an early truck departure can alter another machine's productive window. At completion, reconcile delivery, condition and return records by supplier. Capture the assumptions that changed most often and use them to improve the next procurement brief.
Put it into a practical brief
For a small compound and earthworks package, list the shed, power, excavator and truck bookings on one dated schedule. Add a readiness condition to each: prepared standing area, completed connections, clear access or confirmed receiving destination. Name the person who checks each condition and contacts the affected supplier. If one task slips, update all dependent bookings and keep their acknowledgements together. This approach makes it easier to identify which hire should be extended and which can finish, rather than extending the entire package because one dependency remains unresolved.
Where do the suppliers' responsibilities meet?
The interfaces between deliveries, setup and support often determine whether the package works. Give each supplier the same sequence and a named coordinating contact.
| Decision | Information needed | Next step |
|---|---|---|
| Arrival | Delivery order and receiving space | Identify which item depends on another. |
| Work | Shared access and support | Allocate fuel, connections and operator responsibilities. |
| Removal | Off-hire sequence and collection | Keep access until the last item leaves. |
A worked planning example
A hypothetical site establishment needs facilities, a generator and handling equipment from separate companies. The facilities arrive first, but placement depends on equipment from another supplier and use depends on connections. Send a sequence that shows each dependency and confirms who receives and accepts each item. Include a contingency for a delayed delivery and identify who may revise the schedule. Repeat the exercise for removal so the handling equipment is not off-hired before the facilities are collected.
Common mistakes to catch
- Giving different dates to different suppliers.
- Assuming another contractor supplies the missing connection.
- Off-hiring support equipment before dependent items are removed.
References for your enquiry
Official pages consulted on 24 September 2026. The examples above are original planning illustrations.
- Safe Work Australia: managing risks of plant ↗
Model guidance for plant-related risk management. Check the applicable state or territory requirements and the specific manufacturer's instructions.
General guidance only. Confirm project-specific requirements with competent people and the proposed supplier.
